How to soundproof a wall in a flat, detached house or semi-detached home
Your neighbour’s vacuum cleaner, a television on the other side of the wall or music coming from the next room. Learn how to improve the sound insulation of a wall using rebond foam, how to choose the right adhesive and how to finish the system with plasterboard.
Soundproofing a wall in a flat or house is not simply a matter of attaching an acoustic material to its surface. The way the insulation is installed, the construction of the lining and the elimination of weak points through which noise can still enter the room are equally important.
Even a good insulating material may not deliver the expected result if gaps are left in the construction, rigid connections create paths for vibration or the finishing layer is installed incorrectly.
Kokon Pro offers two wall sound insulation solutions: Wall Barrier, designed for direct installation on an existing wall, and Wall Panel, used as infill within a stud frame.
In this guide, we explain the differences between the two systems, how to prepare the wall, what to consider when choosing an adhesive and how to install the plasterboard correctly so that the entire lining remains stable for years.
Wall Panel or Wall Barrier: which wall sound insulation system should you choose?
Both products are made from rebonded polyurethane foam, commonly known as rebond. It is produced by bonding recovered pieces of foam into a compact structure with a specified density.
Although Wall Panel and Wall Barrier use the same material technology, they have different applications and installation methods.
| Wall Barrier | Wall Panel | |
|---|---|---|
| Primary application | Additional insulation for an existing wall | Infill for a stud frame |
| Installation method | Bonded directly to the wall | Installed within a framed construction |
| Density | 140 kg/m³ | 80 or 140 kg/m³ |
| Available thicknesses | 30 and 50 mm | 30 and 50 mm |
| Finish | Covered with plasterboard | Plasterboard fixed to the frame |
Wall Barrier is suitable when you want to add insulation to an existing wall while limiting the depth of the new construction.
Wall Panel is designed for projects involving a metal or timber-framed wall lining. The foam fills the space inside the frame, while the plasterboard is mechanically fixed to the studs.
This does not automatically mean that one product will provide better sound insulation than the other. The final performance depends on the complete build-up, the construction of the existing wall and the quality of the installation.
Before installation: identify where the noise is coming from
Sound travels through buildings in different ways. Conversations, music and television are primarily airborne sounds. Impacts, moving furniture and footsteps can generate vibrations that travel through the structural elements of the building.
This distinction matters because adding insulation to one wall will not always solve the entire problem.
If noise also travels through the ceiling, floor or adjoining walls, some of it may bypass the insulated surface. This is known as flanking transmission.
Before starting the installation, assess not only the wall itself but also its connections with the other elements of the room.
How should you prepare a wall for acoustic insulation?
Correct substrate preparation has a direct effect on the durability of the installation, particularly with Wall Barrier, where the material is bonded to a vertical surface.
The wall should be dry, stable, sufficiently even and free from anything that could weaken the adhesive bond.
Before starting work, remove loose paint, unstable plaster, dust, grease and remnants of old wall coverings. Repair cracks, holes and uneven areas with a product suitable for the type of substrate.
Pay particular attention to walls coated with poorly bonded paint and to plaster that produces large amounts of dust. Even a high-quality adhesive cannot create a durable bond if it is applied to a layer that is already separating from the wall.
If the substrate requires priming, use a primer compatible with the selected adhesive system and observe the drying time specified by its manufacturer.
Important: Do not install insulation over a damp wall or a surface affected by active mould growth. The source of the moisture must be identified and eliminated first. An additional wall lining may make it more difficult to notice if the problem continues to develop.
Installing Kokon Pro Wall Barrier: wall sound insulation without a stud frame
Wall Barrier is designed to create an additional insulating layer directly on an existing wall.
The product is available in two thicknesses: 30 and 50 mm. Both versions have a density of 140 kg/m³, making them relatively heavy compared with lightweight upholstery or decorative foams.
Choosing the correct adhesive is therefore one of the most important stages of installation.
Step 1. Choose an adhesive suitable for rebond foam
Not every construction adhesive is suitable for rebonded polyurethane foam.
Rebond has a porous structure, so the choice of adhesive should take into account not only its initial grab but also its performance on absorbent surfaces and its ability to support loads over time.
The adhesive should offer the following properties:
-
Compatibility with polyurethane foam: its composition must not cause degradation, dissolution or undesirable changes in the structure of the material.
-
Adhesion to porous surfaces: it must create a reliable bond between the rebond and concrete, plaster, brick or another approved substrate.
-
Sufficient bond strength: it must be suitable for holding the insulation permanently on a vertical surface.
-
Controlled absorption and appropriate application: it should not be absorbed so deeply into the material that too little adhesive remains within the bonding area.
-
Compatibility with the planned lining system: this is particularly important if additional layers will also be installed using adhesive.
When using contact adhesives, pay attention to the required flash-off time, application pressure and curing time. These values depend on the particular product, so always follow the adhesive manufacturer’s instructions.
Step 2. Plan the layout and cut the Wall Barrier boards
Plan the position of every board on the wall before applying the adhesive.
Wall Barrier boards measure 1,000 × 500 mm. Depending on the height and width of the room, the final pieces may need to be cut to size.
Use a sharp tool suitable for dense polyurethane foam. Make all cuts on a stable work surface and use a straight edge as a guide.
Aim for clean, straight edges. The individual boards should fit closely together without visible gaps, but the foam should not be compressed excessively.
Before applying the adhesive, test-fit the boards, particularly around corners, electrical sockets and service penetrations.
Step 3. Apply the adhesive to the wall and foam
If the selected contact adhesive requires application to both surfaces, coat both the prepared substrate and the appropriate face of the Wall Barrier board.
Apply the adhesive evenly and at the coverage rate specified by the manufacturer. Do not replace full-surface bonding with a few randomly placed adhesive spots unless the system documentation expressly permits it.
Spot bonding may create uneven support, local deformation and reduced installation durability.
Using the correct amount of adhesive is particularly important with porous materials. A layer that is too thin may fail to form a proper bond, while excessive adhesive may extend the flash-off time and interfere with curing.
Step 4. Observe the required waiting time before joining the surfaces
Contact adhesives do not always allow the two surfaces to be joined immediately after application.
Many products require a waiting period so that some of the water or solvent can evaporate and the adhesive can reach the correct condition for bonding.
There is no universal waiting time for every adhesive. The required period will depend on the adhesive technology, temperature, humidity and the absorbency of the substrate. Always follow the values stated in the current technical data sheet.
When using solvent-based adhesives, provide appropriate ventilation, wear the required personal protective equipment and remove all sources of ignition. Ventilating the room for only a few minutes may not be sufficient.
Step 5. Position and press the Wall Barrier board firmly into place
Once the adhesive has reached the required installation stage, position the board in the correct location.
Contact adhesives with a high initial grab may allow very little adjustment after the surfaces meet, so accurate positioning is essential.
Press the board evenly across its entire surface, paying particular attention to edges and corners. Areas that are not pressed firmly enough may begin to detach over time.
Do not confuse the adhesive’s immediate grab with its full bond strength. Even if the board stays in place immediately after installation, further work should only continue after the curing time specified by the adhesive system manufacturer.
Step 6. Install the remaining boards without gaps
Fit the remaining Wall Barrier boards closely edge to edge, following the layout prepared earlier.
Do not leave empty spaces between the boards or around service penetrations. If the wall layout allows, stagger the boards to avoid creating long, continuous joint lines.
Once the installation is complete, inspect the entire surface. Check the adhesion of the edges, the stability of each board and the accuracy of all joints.
Only after the insulating layer has been installed correctly should you begin finishing the wall.
How can plasterboard be installed over Wall Barrier without a stud frame?
This is the most important stage in terms of the long-term safety and durability of the complete lining.
Wall Barrier is not intended to serve as the final finished surface. It must be covered with plasterboard to create a smooth, rigid surface ready for decoration.
Some frameless systems allow plasterboard to be bonded directly to the insulation. However, this method must be approved for the complete combination of materials—not merely for the adhesive itself.
Why?
Plasterboard is relatively heavy. Its weight must be transferred safely through the adhesive layer, the foam, the second adhesive bond and finally into the existing wall. Initial adhesion is not the only consideration. Long-term shear loading, material deformation and resistance to delamination must also be taken into account.
Bonding plasterboard directly to rebond without a frame should only be carried out as part of a system for which the manufacturer has confirmed the installation method and the way in which loads are transferred.
If the system permits this construction, the process will include preparing the surfaces of the foam and plasterboard, applying a compatible adhesive as instructed, observing the required working time, positioning the board accurately and pressing it evenly into place.
Any temporary support, curing time before further loading, dimensional limitations and additional mechanical fixings must comply with the system documentation.
A strong initial grab alone should never be treated as sufficient proof that the plasterboard has been fixed safely.
Why are perimeter gaps required at the floor, ceiling and adjoining walls?
The connections between an acoustic wall lining and the surrounding surfaces are extremely important.
The plasterboard should not create unintended rigid connections with the floor, ceiling or adjoining walls. Such connections could provide a path for vibration and reduce the effectiveness of the insulation.
Acoustic lining systems therefore use appropriate perimeter gaps. Their width should be determined by the design of the selected construction. Some systems use a gap of approximately 5 mm, but this is not a universal value.
At floor level, an appropriate spacer or resilient strip may be used where required by the construction.
Once the boards have been fixed, the acoustic gaps should be sealed with a permanently flexible product approved for the application. The sealant should restrict the passage of air through the joint without creating a rigid bridge.
Select the sealant according to its flexibility, adhesion, required fire performance and compatibility with the other materials in the system.
Installing Kokon Pro Wall Panel in a stud frame
Wall Panel is designed as infill for framed constructions. It can be used in additional acoustic wall linings and in properly designed partition walls.
Unlike Wall Barrier, it does not require the full surface of the foam to be bonded to the existing wall. The material is placed inside the prepared frame, while the plasterboard is fixed directly to the studs.
Kokon Pro Wall Panel is available in thicknesses of 30 and 50 mm and in two densities: 80 kg/m³ and 140 kg/m³ for the HD variants.
Step 1. Design the wall lining
Before installation, determine the total depth of the construction, the spacing of the studs and the way in which the frame will connect to the surrounding building elements.
When insulating a party wall between flats, consider using an independent wall lining that limits direct mechanical connections with the existing wall.
This can make a significant acoustic difference. Every rigid connection between the original wall and the new lining may become a path for vibration.
If the frame must be fixed to the existing masonry, use the solutions and fixings specified in the acoustic design. Applying an acoustic strip beneath a fixing does not, by itself, completely decouple the construction.
Drylining manufacturers offer both wall linings fixed to the existing wall and independent systems. Their construction and acoustic performance are not the same.
Step 2. Install the profiles and acoustic tape
Mark out the position of the new lining on the floor, ceiling and adjoining walls, checking that the entire construction remains level and plumb.
Where required by the selected system, separate the perimeter tracks from the building structure using suitable acoustic isolation tape. The tape limits direct contact between the metal frame and the surrounding surfaces.
Install the vertical studs at the centres specified in the drylining system documentation. Their spacing must be appropriate for the profile type, wall height, number of plasterboard layers and expected loads.
Remember that Wall Panel foam is not a load-bearing component. The stability of the entire lining depends on a correctly designed and securely installed frame.
Step 3. Cut Wall Panel to fit the frame
Measure the spaces between the studs before installing the insulation.
Cut the Wall Panel boards so that they fill the available spaces accurately.
The most important requirement is continuity of the insulating layer. Avoid unnecessary gaps between the foam boards and around the profiles.
At the same time, do not compress the material excessively. Using insulation that is too thick for the available cavity may push against the lining, cause deformation or make it difficult to install the plasterboard correctly.
When choosing between Wall Panel 30 and Wall Panel 50, always consider the actual depth of the frame.
Step 4. Place the panels between the studs
Begin installing the insulation at the bottom of the frame, fitting each board into the prepared section.
The boards should fill the intended space accurately without leaving empty areas.
Pay particular attention to corners, service penetrations and areas containing additional framing components.
The foam should be fixed or restrained against movement as specified in the design. Do not assume that every board will remain in place solely through friction between the studs. The method used to support heavier HD variants in a vertical position should be considered in particular.
If additional adhesive is required, choose a product compatible with both polyurethane foam and the frame material. Avoid improvised fixing methods that could allow the insulation to settle inside the wall.
Step 5. Check the continuity of the insulating layer
Inspect the entire surface before closing the frame with plasterboard.
All boards should remain in the correct position and every joint between them should be carefully fitted.
Check that the material has not been compressed excessively by services or structural components.
Once the wall has been closed, access to the foam will be considerably more difficult. This is the right time to correct any problems.
Step 6. Fix the plasterboard to the frame
In a framed construction, the plasterboard is mechanically fixed to the studs using screws intended for the selected system.
Choose the type and thickness of board according to the practical and acoustic requirements of the project. Systems designed for higher sound insulation may use specialist acoustic plasterboard or a double layer of boards.
Fix the boards using the recommended screw centres and maintain the required distance from their edges. In double-layer systems, stagger the joints between the individual layers.
For example, some Knauf acoustic wall lining systems specify screw centres of 250 mm, while other systems may require different spacing. One fixing pattern should therefore not be applied to every construction.
Step 7. Form the required movement joints and seal all connections
As with Wall Barrier, the perimeter connections must be completed correctly.
Maintain the installation clearances required between the plasterboard and adjoining surfaces, including any slip joints or movement joints specified for the selected system.
Fill all gaps intended for acoustic sealing with a product suitable for that application.
Pay particular attention to airtightness around services, electrical boxes and cable penetrations. Gaps in these areas may reduce the effectiveness of the insulation even when the main surface of the wall has been filled correctly.
Once the installation is complete, the board joints can be taped and filled before the surface receives its final finish.
The most common wall sound insulation installation mistakes
Even carefully selected foam may fail to produce the expected result if fundamental installation errors are made.
-
Bonding the foam to an unprepared substrate. Dust, peeling paint and unstable plaster may cause the adhesive to detach together with the surface layer of the wall.
-
Using an unsuitable construction adhesive. Not every product is designed for porous polyurethane foam. Strong initial adhesion does not automatically guarantee a durable bond.
-
Applying the adhesive incorrectly. Insufficient adhesive, uneven coverage or spot bonding contrary to the manufacturer’s instructions may cause the insulation to detach.
-
Ignoring flash-off and curing times. Joining the surfaces too soon or loading the adhesive before it reaches the required strength may weaken the fixing.
-
Installing heavy plasterboard without an approved system. An adhesive suitable for foam is not necessarily capable of supporting plasterboard directly. This connection requires particular care.
-
Leaving gaps in the insulating layer. Poorly fitted foam interrupts the continuity of the layer and may reduce the performance of the entire system.
-
Creating acoustic bridges. Rigid fixings and incorrectly formed connections can transmit vibration between elements of the construction.
-
Failing to seal the perimeter correctly. Sound can pass through gaps even when most of the wall has been insulated properly.
-
Compressing the foam too tightly within the frame. Excessive compression changes the way the material performs and may deform the finished lining.
-
Creating oversized openings around services. Large, unsealed gaps around cables and electrical boxes may create local paths for noise transmission.
Can you soundproof a wall yourself?
Wall sound insulation can be installed as a DIY project, provided the work is planned correctly, compatible materials are selected and all relevant installation instructions are followed.
With Wall Barrier, particular attention must be paid to substrate preparation and the bonding method.
When installing Wall Panel, the key requirements are a correctly constructed frame, stable support for the infill and careful installation of the plasterboard lining.
If the project includes a heavy frameless lining, unusually high walls, specific fire-safety requirements or additional loads, the proposed system should be checked by a suitably qualified professional.
You should also plan in advance how any fixtures and furniture will be supported. Heavy cabinets, televisions and shelves should not be attached to the plasterboard or insulation without confirming the load-bearing capacity and installing appropriate reinforcement.
Effective sound insulation begins with correct installation
Soundproofing a wall in a flat, semi-detached home or detached house is an investment in everyday comfort. To achieve the expected result, it must be treated as a complete construction system—not simply as an additional layer of material.
Explore Kokon Pro wall sound insulation products and choose a solution suited to your renovation. If you have any questions about the wall construction, adhesive or finishing method, contact us before starting work.