Before you begin
The performance of Kokon Pro products depends not only on choosing the right material but also on how it is installed. Proper preparation of the substrate or supporting structure, precise fitting of the material and carefully sealed joints all make a difference.
Rebond is easy to cut and install, but gaps, an uneven substrate or incorrect fixing can reduce the performance of the entire system. Before starting work, make sure you understand the installation requirements for your chosen product—whether you plan to install it yourself or hire a professional.
We have prepared separate instructions for each Kokon Pro product line. They include a list of the tools you will need, guidance on preparing the installation area and step-by-step directions.
Floor
Floor 3 and Floor 5 are installed beneath floating floors. Floor 10 is designed primarily for use beneath fitted carpets and selected specialist flooring systems.
Explore FloorWall
Wall Barrier is bonded directly to a solid wall. Wall Panel is fitted between the studs of a wall lining or partition wall.
Explore WallCeiling
Top is installed within a suspended ceiling structure. The structure must be designed to support the weight of the insulation and all other layers.
Explore TopInstallation instructions
Kokon Pro installation instructions are available to view and download.
Technical Data Sheets
Kokon Pro instructions explain how to install rebond products. They do not replace a structural design or the instructions provided by the manufacturers of flooring, plasterboard, profiles, adhesives, fixings or other system components. The requirements of the complete system take precedence over the general information provided on this page.